Basic Rules and Regulations :
The participating teams need to prepare a bridge structure as per the following specifications and submit it by the date mentioned
RULES:
1. Four members per team.
2. The teams can use only the materials that are allowed by the organizers. Any material used not within the list shall not be entertained under any circumstances.
3. The teams have to submit an abstract of not more than 200 words, on the structure giving rough drawings giving the idea of the structure made.
4. on the day of submission the teams will need to interact with the judges and explain the frame of the structure built
ITEMS TO BE USED:
PLASTIC STRAWS, PINS, CELLO TAPE, GLUE, THREAD, ICECREAM STICKS.
SPECIFICATIONS:
MAXIMUM SPAN - 150 cms
MAXIMUM WIDTH - 30 cms
HEIGHT OF DECK FROM GROUND LEVEL - 30 cms
MAXIMUM HEIGHT OF STRUCTURE - 75 cms
LAST DATE FOR SUBMISSION OF STRUCTURES AND ABSTRACTS- April'24, 2010 at C-103/M-103. The time and venue shall be notified in the schedule.
Event Coordinators:
Swati Mangal(09813560001)
Harpreet(09729747297)
Mayank Khurana (09896334919)
